ROAD REVIEW AND ROAD WORK ORDER- NEW DOSEY TOWNSHIP-2011

ROAD REVIEW AND ROAD WORK ORDER- NEW DOSEY TOWNSHIP-2011

SCHOOL HOUSE ROAD:   Culvert needs a screen

Pit Run (6-board will explain this number)) in low spots

1 load @ l mile in from Pine Cty. 24

2 loads @ .4 mile in from Pine Cty. 24

LOGGERS LANE:                2 loads pit run N. of  Maria’s driveway

ENNERSTROM ROAD:       2 loads Class 5 (from County Pit) 50 yds. back from gate

(Should gate be removed?)

CREEK VIEW LANE:          1 load pit run @ washed-out culvert

8 loads pit run before turnaround.

2 loads pit run on each culvert.

20 loads pit run N. of turnaround

DOYLE LANE:                     Cut trees back 15 ft. from center line (Wes-winter)

3 loads pit run N. from # 63916

1 load pit run in “Bowl” (by yellow & orange sign) S. of

# 64637

Replace old-tile culvert(12”) & cover w/2 loads pit run.

WILDCAT LANE:                10-15 loads Class 5- (thinly spread).

Cover culvert near Agnes’ house

HAY CREEK ROAD: (N. of Pine Cty. 32)

Cover culvert

5 loads each of Class 5 & pit run from # 65246 going N.

(Class 5 on base w/pit run on top)

SQUIB CREEK DRIVE:      4 loads Class 5 by # 75751

1 load Class 5 E. of Deloris’ driveway

HAY CREEK ROAD: (S. of Pine Cty. 32)

6 loads Class 5 going S. from Holter’s to base of

cemetery hill.

6 loads Class 5 from # 59097 going N.

5 loads pit run from # 59623 going S.

Culvert needed at # 58704

WHITE TAIL LANE:                        Ditching (Township will hire this done)

1 load Class 5 over the rocks.

LITTLE FAWN DRIVE:       Dig out in front of culvert to improve the drainage.

MCDERMOTT CREEK ROAD:      2 loads Class 5 from Holter’s going W. to “Stop

Ahead” sign.

5 loads Class 5 from E. of #74434 to #74199.

15 loads pit run from Old    Clint’s driveway to

W. #73159 to Timber Ridge Rd.

Cover w/1 load Class 5

2 loads pit run to cover the corduroy going W. past

Lydia’s driveway.

1 load pit run on culvert by “Trespassing” sign

Ditch the N. side (Township will hire)

Going past Lydia’s driveway- 2-3 loads pit run

Over the hill (all bad spots) & turnaround.

15 loads pit run (6) from Holter’s to # 75370

4 more loads pit run (6) in low spots and more by

the dump)

2 loads pit run on bad part around Todd’s driveway.

2 loads pit run by Wolf’s driveway.

Ditching (Township will hire)

TIMBER RIDGE ROAD:                 3-5 loads pit run (6).

12” culvert by Wes’ driveway.

BEE HIVE LANE:                            Ditching (Township will hire)

Culvert needed.

COVEAU LANE:                              Nothing this year.

HESSLER LANE:                             Nothing this year.

HIGHLAND DRIVE:                                   Nothing this year.

GREEN PINE LANE:                                   1 load good pit run.

KINGSDALE ROAD:                       2 loads pit run from Wes’ driveway going N.

12 loads pit run S. of Canessi’s

Clear the ditch and put 2 more pit run.

Culvert needed at #63830, then cover w/2 pit run

Ditching needed other side of #63157. (Township)

2 loads pit-run S. of #64196 & culvert needed at

driveway, then 1 load pit run N. of driveway

2 loads pit run S. of #64838

Culvert needed at #65622, then contractor must

Ditch, then put 1 load pit run S. of culvert.

3 loads pit run on low spots .4 mile S. of # 66941,

then 3 loads pit run N. of culvert.

KINGSDALE ROAD CON’T          2 loads Class 5 S. of # 67665, then 15 loads Class 5

N. of #67665

Ditching needed SE of curve by Adolph’s Drive.

(Township will hire)

10 loads pit run going N. of #69230.

2 loads Class 5 on the “S” curve.

ROCKY ROAD:                                5 loads pit run in low spots.

OMANS DRIVE:                               2 loads Class 5 to cover corduroy by # 79430.

Culvert needed by #79115

Culvert needed by # 79339

Ditching needed from $79355 (Township)

KINGSDALE LOOP:                                    Nothing this year.

ADOLPHS DRIVE:                          Nothing this year.

MATT LOUREY TRAIL:                 (This is a special project being done in conjunction

w/ Pine County and Trail & Waters. Details

be worked out this summer)

 

MINUTES-REGULAR MEETING-NEW DOSEY TOWN BOARD-MAY 11, 2011

MINUTES-REGULAR MEETING-NEW DOSEY TOWN BOARD-MAY 11, 2011

Meeting called to order at 7:38 p.m  by Chair Dave Fornengo. Also present were Supervisors Dave Baker and Wes Cemenski, Treasurer Margaret Coveau, Clerk Fran Levings and Deputy Clerk Robin Fornengo.

Motion by Dave Baker, second by Wes Cemenski, to approve the minutes of the regular town board meeting of April 13, 2011, as printed.  Carried.  Motion by Wes Cemenski, second by Dave Baker, to approve the minutes of the Board of Review and Equalization of April 11, 2011.  Carried.

Treasurer Margaret Coveau presented the Treasurer’s Report.(Copy attached to file copy of these minutes) Fund balances are:  General Fund-($314.45), Road & Bridge Fund-$8661.93, Cemetery/Landscaping- $551.39, Fire Protection Fund-$222.00, Fire Hall Fund-$125.45, Cartway Fund-$2428.41, Savings-$7133.97 and CDs- $50,867.43.  Motion by Dave Fornengo, second by Dave Baker, to approve the Treasurer’s Report.  Carried.

Clerk Fran Levings presented the Claims and Net Payroll for approval. (Copy attached to file copy of these minutes). Motion by Wes Cemenski, second by Dave Baker, to pay these bills.

CLERK’S REPORT:

1.  Reminder of dates:

May 13- Cemetery Cleanup    1 p.m.

May 14- Road Review

June 30th –MAT Short Course (Pre-register at $45

Pay at door $55.)

  1. Clerk will have Town Rental Policy ready for supervisors to approve at June meeting.
  2. Clerk is in the process of culling any old records in accordance with the MN Historical Society recommendations.
  3. Clerk is also going through the Legal Compliance Guide from MAT.
  4. Letters received from Lakes & Pines and Central Applicators.

ZONING REPORT:

  1. Zoning administrator received a copy of a Compliance Inspection regarding sewer on property being sold by a landowner on Tamarack River Road.

OLD BUSINESS:

  1. Motion by Dave Fornengo, second by Wes Cemenski, to postpone any work on dedicating Ox Creek Road as a township at this time.
  2. Regarding Matt Lourey Trail- Supervisor Baker reported on conversations he has had with the Pine County Soil & Water District, the DNR and the state Board of Water and Soil Resources. He learned that to prove that this trail is an existing town road, the township must present a map, minutes of the Matt Lourey Trail hearing, and copies of property owner’s deeds that the trail is indeed a town road providing access to their property. Joe Alberio, Trail & Waterways reiterated their commitment to providing manpower and equipment for the project.  Pine County will provide gravel.
  3. Supervisor set 7:30 a.m. as the time for the Road Review on May 14th.
  4. Supervisor Baker said that MAT informed him that the township would be covered for any road work done in Wisconsin.
  5. Supervisor Baker reported that Alternative Energy Specialist Chris Schmitt would provide consultation for our project at a cost of $75/hour.  Chair Fornengo said the most expensive part of the project will be the grid-tie component. Mr. Baker said he envisioned the project as having 2 solar panels , a grid-tie and going from there.  All 3 supervisors agreed to price components and report at the June meeting. Mr. Fornengo will inquire with East Central Energy about the rebate program.
  6. Discussion of yard damage done to homeowners during the last plowing of drives.  Supervisors will put this on the Road Review and see what needs to be done.
  7. Supervisor Baker distributed copies of the Wetlands Delineation Study.  Current status or the cartway project is to wait for the decision to be made by the Technical Evaluation Panel.

NEW BUSINESS:

  1. Motion by Dave Fornengo, second by Dave Baker, to approve the Resolution Regarding Board Member/Employee Conflict of Interest.  Carried.

Meeting adjourned at 8:47 p.m.

Respectfully submitted,

Fran Levings, Clerk

Also signed by the Chair _______________________ Date________