SCHOOL HOUSE ROAD: Culvert needs a screen
Pit Run (6-board will explain this number)) in low spots
1 load @ l mile in from Pine Cty. 24
2 loads @ .4 mile in from Pine Cty. 24
LOGGERS LANE: 2 loads pit run N. of Maria’s driveway
ENNERSTROM ROAD: 2 loads Class 5 (from County Pit) 50 yds. back from gate
(Should gate be removed?)
CREEK VIEW LANE: 1 load pit run @ washed-out culvert
8 loads pit run before turnaround.
2 loads pit run on each culvert.
20 loads pit run N. of turnaround
DOYLE LANE: Cut trees back 15 ft. from center line (Wes-winter)
3 loads pit run N. from # 63916
1 load pit run in “Bowl” (by yellow & orange sign) S. of
# 64637
Replace old-tile culvert(12”) & cover w/2 loads pit run.
WILDCAT LANE: 10-15 loads Class 5- (thinly spread).
Cover culvert near Agnes’ house
HAY CREEK ROAD: (N. of Pine Cty. 32)
Cover culvert
5 loads each of Class 5 & pit run from # 65246 going N.
(Class 5 on base w/pit run on top)
SQUIB CREEK DRIVE: 4 loads Class 5 by # 75751
1 load Class 5 E. of Deloris’ driveway
HAY CREEK ROAD: (S. of Pine Cty. 32)
6 loads Class 5 going S. from Holter’s to base of
cemetery hill.
6 loads Class 5 from # 59097 going N.
5 loads pit run from # 59623 going S.
Culvert needed at # 58704
WHITE TAIL LANE: Ditching (Township will hire this done)
1 load Class 5 over the rocks.
LITTLE FAWN DRIVE: Dig out in front of culvert to improve the drainage.
MCDERMOTT CREEK ROAD: 2 loads Class 5 from Holter’s going W. to “Stop
Ahead” sign.
5 loads Class 5 from E. of #74434 to #74199.
15 loads pit run from Old Clint’s driveway to
W. #73159 to Timber Ridge Rd.
Cover w/1 load Class 5
2 loads pit run to cover the corduroy going W. past
Lydia’s driveway.
1 load pit run on culvert by “Trespassing” sign
Ditch the N. side (Township will hire)
Going past Lydia’s driveway- 2-3 loads pit run
Over the hill (all bad spots) & turnaround.
15 loads pit run (6) from Holter’s to # 75370
4 more loads pit run (6) in low spots and more by
the dump)
2 loads pit run on bad part around Todd’s driveway.
2 loads pit run by Wolf’s driveway.
Ditching (Township will hire)
TIMBER RIDGE ROAD: 3-5 loads pit run (6).
12” culvert by Wes’ driveway.
BEE HIVE LANE: Ditching (Township will hire)
Culvert needed.
COVEAU LANE: Nothing this year.
HESSLER LANE: Nothing this year.
HIGHLAND DRIVE: Nothing this year.
GREEN PINE LANE: 1 load good pit run.
KINGSDALE ROAD: 2 loads pit run from Wes’ driveway going N.
12 loads pit run S. of Canessi’s
Clear the ditch and put 2 more pit run.
Culvert needed at #63830, then cover w/2 pit run
Ditching needed other side of #63157. (Township)
2 loads pit-run S. of #64196 & culvert needed at
driveway, then 1 load pit run N. of driveway
2 loads pit run S. of #64838
Culvert needed at #65622, then contractor must
Ditch, then put 1 load pit run S. of culvert.
3 loads pit run on low spots .4 mile S. of # 66941,
then 3 loads pit run N. of culvert.
KINGSDALE ROAD CON’T 2 loads Class 5 S. of # 67665, then 15 loads Class 5
N. of #67665
Ditching needed SE of curve by Adolph’s Drive.
(Township will hire)
10 loads pit run going N. of #69230.
2 loads Class 5 on the “S” curve.
ROCKY ROAD: 5 loads pit run in low spots.
OMANS DRIVE: 2 loads Class 5 to cover corduroy by # 79430.
Culvert needed by #79115
Culvert needed by # 79339
Ditching needed from $79355 (Township)
KINGSDALE LOOP: Nothing this year.
ADOLPHS DRIVE: Nothing this year.
MATT LOUREY TRAIL: (This is a special project being done in conjunction